Friday, 16 November 2018

DB upgrade to three phase/upgrade meter 1fasa to 3fasa


Upgrade DB single phase to three phase
Upgrade/application meter Tnb single phase to three phase






DB ( distribution board )


Single phase meter


Back to back lay cable 16mm
Fitting panel meter board three phase
Lay cable 16mm red yellow blue and nuetral


Alhamdulilah tnb da pasang cable sesalur


29/1/19


31/1/19 selesai meter Tnb pasang



**************************************

Membaiki papan meter Tnb yang rosak


B 4


 Running


Done job

**********************************
Alih meter Tnb ke tempat lain

Snap jarak jauh meter Tnb skg ke tempat lain
Tujuan Saya buat estimate



B 4
Gambar sebelum siap


Running



DB upgrade Done



Peralihan Meter Tnb done

Dapatkan sebut harga secara percuma Dr Encik fadil

Tuesday, 25 September 2018








Upgrade DB lama ke DB Baru
Plug Soket Outlets 13A
Suis 3geng
Lampu panjang
Kipas Panasonic

Sekolah agama Dato hj mustapha

Friday, 9 March 2018

Profil kami

Tentang kami Encik AZIZAN

A1

Encik. FELDAUS

PW2

Encik.FADIL


Sijil Kemahiran Malaysia
Tahap Satu


Pengarah Urusan
NAMA: MOHD FADIL BIN ABU TALIB
NO KP :830614-05-5325
TEL: 013-7796164




Sedang menyiapkan kertas kerja untuk permohonan bekalan elektrik(meter tnb) secara online,diharapkan pelanggan - pelanggan kami bersabar dan steady ye😊😊😊,In shaa Allah semoga dipermudahkan urusan,untuk mendapatkan perkhidmatan kami,sila hubungi saya :




Pagar letrik dan rumah

Wiring utk rumah guna tenaga solar (matahari)
lampu, kipas ,plug dll
pagar letrik kawasan ladang pn ada